← All work Case study · Industrial engineering

Operations & logistics: time studies to digital workflows

Before plants and software: timing every warehouse process to size the crew, and leading a digital transformation of order-to-delivery workflows.

Interactive · sample data

What you’re looking at: how a time study turns into a crew size. Try this: change the volumes and standard times.

A generic staffing model in the style I used: volume × standard time = hours needed, per process.

Problem

A distribution warehouse sized its crew by feel, and order-to-delivery workflows ran on paper and phone calls.

What I did

Timed each warehouse process to build staffing models by weekday plus a KPI dashboard; separately, led a WMS/TMS digital transformation as my Industrial Engineering final project.

Result

+15% operational efficiency and +10% sales productivity per worker at the distributor; +15% perfect deliveries in the final project.

Role
Logistics Analyst · IE final project lead
Where
Tucumán, Argentina
When
2023
Methods
Time studies · staffing models · KPIs · WMS/TMS
Status
Completed

01Warehouse time studies

Logistics Analyst, ABC Distributions (Apr – Dec 2023). Raised operational efficiency 15% through time studies and workforce optimization; digital tools lifted sales productivity 10% per worker.

How: each process — receiving, putaway, replenishment, picking, order breakdown, returns — was broken into timed steps, turned into standard times, and multiplied by expected volumes to get the hours needed per weekday. A warehouse KPI dashboard tracked inventory accuracy, turnover and space use.

02Industry 4.0 final project

Industrial Engineering, National University of Tucumán (2023). Led a WMS/TMS digital transformation of order-to-delivery logistics workflows, raising perfect deliveries by 15%.

03Results

+15%operational efficiency (warehouse)
+10%sales productivity per worker
+15%perfect deliveries (final project)
2023both completed