← All work Case study · Applied AI · project engineering

ProjectTracker

The visual command center I run my projects from every day. A board for every job, a digest of what changed, a timeline of each problem, a 180-day schedule and a flow map of what is holding each project — with the email, milestone and drawing automation built in. I built it on my own, for my own job as a project engineer: when the work needs a tool, I build it.

Résumé · Applied AI (PDF) ↓ Code on GitHub ↗

Board → open a project → its Story: one lane per problem, colour = who has the ball. Recorded in the app running on fictional sample data; the real tool and its data are private.

Problem

Running ~20–25 live projects meant information spread across Outlook, the ERP and SharePoint: hours each week matching ~145 emails to jobs, updating the ERP by hand and catching drawing errors late.

What I did

A desktop command center — board, Today digest, Story timelines, 180-day schedule, flow maps, equipment ledger — fed by rules-first automation that files email, detects milestones and checks drawings. I approve every ERP write; the LLM only writes one-line summaries.

Result

~7.3 h saved per week (~340 h/year), 94% agreement with my past manual decisions, and real drawing errors caught before release.

Role
Sole designer & developer
Built for
My own daily work as a project engineer
When
Jun 2026 – present
Stack
Electron · JavaScript · Outlook · Acumatica ERP · SharePoint
Status
In daily use

01Tour

These are the screens I work in all day. Every screenshot and loop below is the real app running on fictional sample data — invented companies, people, job numbers and amounts. Click a screenshot to see it full size.

Loop
Projects boardEvery job as a card in its stage column, with its current phase and next step, value, days since the last news and my next action. Drag a card to change its stage; the strip on top flags updates that are late.Why it helpsI see all my jobs at once, and the ones going quiet stand out before a customer has to ask.
Today view: since-you-left digest, my actions, waiting on others and stalled projects
TodayA “since you left” digest of new mail, due dates and logged updates, then my actions, what I am waiting on (customer, vendor or teammate, and for how many days) and projects with no news in 14 days.Why it helpsMy morning starts from what changed and who owes what, not from a full inbox.
Project window with phase stepper, next step box, activity log and scope and pricing
Project windowOne job on one screen: the phase stepper from lead to aftermarket, the next step with who it waits on, the activity log of notes, actions and waiting-on items (each linked to its source), and scope & pricing.Why it helpsEverything about a job is in one place, and every line says where it came from.
Story timeline: one swimlane per problem, coloured by who has the ball, with a today line
Story timelineOne lane per problem, from its first mail to its last, coloured by who has the ball — me, the team, the customer or a vendor — with a dot per mail and a today line.Why it helpsIn a status meeting I can show how long a problem has been open and who it is waiting on.
Loop
InboxMail already matched to its project. Problems come as issue cards (cause, who it waits on, next step, consequences such as a return visit); everything else is one proposed line per message. J/K to move, A to approve, X to discard.Why it helpsTriage takes minutes, and nothing reaches the project record or the ERP without my approval.
Schedule: 180 days week by week with ship, install, start-up and training bars and install clash alerts
ScheduleThe next 180 days, week by week: shipments, installs, start-ups, training and site visits, read from the Gantt, mail notices and my notes. Two installs in the same week raise a clash alert.Why it helpsA clash between two installs shows up weeks ahead, while it can still be moved.
Project flow list: each project’s phases as dots, its next step and what is holding it
Project flowEvery project’s phases as a row of dots, the next step and its owner, and what is holding it, with the initials of who it waits on.Why it helpsOne glance tells me which job is blocked and by whom.
Loop
Flow mapOne project as a map: phases as columns, each step with its owner, site work in parallel, and the open items hanging off the step they hold. Arrow keys fly between phases.Why it helpsA long email history becomes a map I can walk my manager or a new teammate through.
Equipment ledger: searching a crossdraft booth by working size, with similar equipment from past projects
Equipment ledgerEvery equipment record from past projects, searchable by type and working size (“crossdraft 40x14x12”), with the full spec sheet and similar equipment from other jobs. The real one holds 1,697 items from 620 projects.Why it helps“Have we built this before?” takes seconds, so a quote starts from real past jobs.
Insights: open pipeline, win rate, projects by stage and top customers
InsightsOpen pipeline, win rate, open actions, projects by stage and top customers, across every project on the board.Why it helpsI know what I am carrying and where it sits, without building a spreadsheet.
Control center slide listing projects in progress with their phase dots and open items
Control centerSlides for a screen left open during the day: projects in progress, the next 45 days, new mail, what needs attention, pipeline and who holds the open items.Why it helpsThe week stays visible without opening anything.
System overview: the program drawn as a finishing line, with data sources feeding stations
System overviewThe program drawn as a finishing line, for presenting: mail, ERP, project folders and the archive feed stations such as “sort the mail”, “find the step”, “plan 180 days” and “check the layout”.Why it helpsI explain the software the same way I explain a paint line.

02Context

As a project engineer I lead the engineering on 54 opportunities (USD 21M quoted). The information for each one is spread across Outlook threads, the Acumatica ERP and SharePoint folders full of layouts, vendor drawings and quotes. Keeping the ERP current and catching mismatches between documents was manual, slow and easy to get wrong.

Constraints I designed around: mail and ERP are read-only unless I approve a change, nothing may be written silently, and every decision the tool makes has to be explainable to me in one line.

03My role

Everything, end to end. I scoped the problem from my own workload, designed the matching rules and detectors, built the desktop app, wired it to Outlook, the ERP and SharePoint, and measured it against my own past decisions.

04How the automation works

  1. Ingest. Mail is exported read-only every 2 hours; the ERP is refreshed read-only once a day; project folders and drawings are read from SharePoint.
  2. Match. Each email is scored against every project with 9 evidence signals — project number in the subject (0.97), ERP opportunity ID (0.90), known thread (0.88) … client name in the subject (0.55) — plus 0.12 for each extra kind of evidence. Below 0.45 it is ignored.
  3. Detect. 13 deterministic detectors spot milestones: order accepted, submittals, ship date (read from the vendor PDF), new opportunity, site access and more.
  4. Check drawings. Layout PDFs are scored against 44 criteria in 7 groups and cross-checked against quotes and vendor drawings; near-misses within 2.5% are flagged too.
  5. Explain. An optional LLM writes a ≤160-character factual summary of the thread. It never sets IDs, statuses or decisions.
  6. Approve & write. Proposals land in an inbox (J/K to move, A to approve, X to discard). An approved ERP note is re-read, appended, confirmed, saved, re-read to verify, and backed up.

05Architecture

ProjectTracker architecture Outlook, the ERP and SharePoint feed a deterministic rules engine (email matcher, 13 milestone detectors, 44-criteria drawing check). Its decisions go to a review step where I approve them; approved items update the tracker views and are written to the ERP. An optional LLM only writes one-line summaries. SOURCES · READ-ONLY OutlookMail exportedevery 2 hours Acumatica ERPDaily refresh ofopportunities and POs SharePointProject folders,layouts and drawings RULES ENGINE · DETERMINISTIC Email → project matcherWeighted evidence, 9 signal types;every decision carries its evidence 13 milestone detectorsPO accepted, submittals, ship date,new opportunity, site access… 44-criteria drawing check28 checked automatically from thedrawing set, 16 flagged for a human LLM, optionalWrites a one-line summary. Never decides. REVIEW I approve≥ 0.88: attachedautomatically0.45–0.88: review lane< 0.45: left unassignedEvery ERP write: 1 click OUTPUTS Tracker viewsBoard, Today digest,timelines, schedule,flow maps ERP noteRe-read, appended,saved, re-read toverify, backed up
How mail, ERP and drawings flow through the tool. Rules make every decision and show their evidence; the LLM only writes text; nothing reaches the ERP without my click.

06Rules decide, the LLM writes, a human approves

Decision

Rules decide; the LLM only writes

Matching, milestones and drawing checks are rules with weights I can read and test. The LLM is used where language matters — summaries — not where correctness matters.

Decision

A human approves every ERP write

The tool proposes, I decide. Every write is re-read and verified afterwards, with a backup of what was there before.

Decision

Measure against my own history

Accuracy is reported as agreement with decisions I had already made by hand (94%), not as a self-reported model score.

Decision

Index the past to answer the present

1,697 equipment items from 620 archived projects are searchable by size and type, so “have we built this before?” takes seconds.

07Results

~7.3 hsaved per week (~340 h/year)
94%agreement with my past manual decisions
1,697equipment items indexed from 620 projects
44drawing criteria checked automatically

Errors caught before a drawing was released include an order-number typo, a 350 vs 500 lb hook-load mismatch and a ceiling-height mismatch.

08How I evaluated it

I didn’t trust the tool until it had been measured against real mail and real decisions. Three checks, each answering a different question:

63% → 95%email-to-project accuracy, first version vs. current
1 / 141approved proposals filed to the wrong project
8,771emails (one year) replayed to benchmark the detectors
94%agreement with my past manual decisions
  • Iterating on real history. Each version of the matching rules was replayed against threads I had already filed by hand. Accuracy went from 63% in the first version to 95%.
  • Benchmarking the detectors on a full year. I replayed 8,771 emails through the milestone detectors and checked every hit; for example, order acknowledgements 9/9, new opportunities 12/12 and site-access requests 13/13 were caught.
  • Auditing real use. After it went live I audited what I had approved: 1 of 141 approved proposals had been filed to the wrong project.

The method is written up as a note: Measure AI against your own past decisions →

09Try parts of it

Small interactive rebuilds of pieces of the tool, running in your browser on sample data: replay one email from inbox to ERP note, triage an inbox, move cards on a board, run the drawing check, and see how it is built.

Loading the interactive demo…

10Confidentiality

ProjectTracker is a tool I built and use at work. Its source code and real project data are private. The screenshots and loops come from the app running on fictional sample data — invented companies, people, emails, job numbers and amounts, with company branding removed. The interactive labs are rebuilds on sample data that mirror the real logic.